From this point on we follow our Production Model.
Internal meeting where we brainstorm ideas and explore possible solutions and the project’s scope.
We suggest materials and the processes that will be followed.
We define as much as possible in order to create the quote.
Quote
We analyze the project’s costs in order to obtain an estimate or quote, depending on the level of detail provided by the client.
Design & Development
Once contracted, we continue to work on the previously proposed solution.
We assign a Basecamp user to achieve direct and efficient interaction and communication.
We develop engineering and production drawings.
We specify the materials and suppliers.
Planning of Fabrication and Installation Process.
We assign the correct personnel and workforce for the project.
Fabrication
We implement a production process based on simple and precise instructions, taking the best advantage of the technical abilities of the work team and Kinetica’s and our allied supplier’s infrastructure.
During the whole process we follow a tight quality control method to achieve the expected results.
Installation
Since the projects initial stages we design the transportation and installation logistics, whether in Monterrey, or elsewhere.
We install until the very last detail.
Final project walkthrough and hand over.
Production Model
an effective method expressed as a list of well defined instructions for a manufacturing process. Describing a plan that, when executed, will proceed through a finite number of well- defined successive stages.
introduction
conceptualization
design & engineering
planning
on-site verification
mmm fabrication and production lines
programming and assigning of human resources
production
total quality control
on-site modifications
sincronizing with on-site contractors
storage, packaging, transportation and maneuvers
material reception process
installation process
project completion
feedback and conclusions
General analysis of the needs
Evaluation of circumstances
Functional Requirements
Project Description
Project Scope
Material Specification
Design Drawings
Building Information Model (BIM)
Development of Requirements
Flow Chart
Gantt Chart
Establishing critical points in field
Measurement and Verification report
Conclusions
Mockup, Model and Mold Fabrication
Designing and organizing production lines
Programming Production
Material Quantification
Execution Schedule
Production procedures Production Logbook Activity Reports
Progress Reports
Quality Parameters
Quality Control Method
Control Tests
Installation logistics
Evaluation of recieved material
On field storage report
Verification of Installation
Verification of onsite adaptations
Verification of contractors synchronization
Verification of installation material
Installation Manual Installation Logbook Activity Report
Progress Report
Final project walkthrough
As built blueprints delivered
Considerations and comments
Operation and Maintenance Manual